Projects

Applies to version 26.99.5

Projects are the heart of REDZ.BUILD. Every site you run becomes a project that ties together your workers, attendance, materials, equipment and what the client sees.

Two ways to run a project

Rental (labour)Day-rate

Bill the client for the work your crew puts in — tracked from attendance against day-rates.

Estimate (fixed)Milestones

Agree a fixed scope billed by milestones or a single fixed price.

Inside a project

Work plan & subobjects

Break the job into stages and sub-deliverables; track weighted progress.

Geofence & QR

A location and QR code so workers can check in on site.

Rental rates

A project day-rate, with per-worker overrides where needed.

Linked costs

Purchases, materials and equipment attach to the project and its subobjects.

Project lifecycle

StatusMeaning
DraftSetup only — no activity recorded yet. Mode is still changeable.
ActiveLive: accepts check-ins, reports, purchases and payroll.
PausedNo new activity, but still editable.
CompletedClosed. Re-open to record more activity.
ArchivedKept for reference, locked.
CancelledAbandoned. Can be resumed.

Project reports

  • Profit — revenue minus labour and materials, for a date range.
  • Worker balance — labour earned, advances, fines and bonuses.
  • Client balance — charged versus paid-in.
Docs

Frequently asked questions

Not after it leaves Draft — the mode locks once the project is operational. Create a new project if you need the other mode.

Only an empty Draft can be deleted. Once a project has activity, archive it instead so its history is preserved.

No. You control visibility per project and per stage, and whether worker names are shown.